Lomas Bayas II photos 

In October 2009, Xstrata Copper announced the Xstrata plc Board approval of the Lomas Bayas II project to increase the life of Lomas Bayas mine in northern Chile by at least 12 years. The images below illustrate the construction project’s progress.

 

March 2012
Transfer platform N°1
March 2012
Transfer platform N°1
March 2012
Platform for installation of conveyor belt and transfer zone N° 1
General view
March 2012
Platform for installation of conveyor belt and transfer zone N° 1 General view
March 2012
Primary crusher Lomas II
Construction of earth wall
March 2012
Primary crusher Lomas II Construction of earth wall
March 2012
Primary crusher Lomas II
General view of construction of wall 1
March 2012
Primary crusher Lomas II General view of construction of wall 1
March 2012
Primary crusher Lomas II
Installation of base
March 2012
Primary crusher Lomas II Installation of base
March 2012
Primary crusher Lomas II
Installation of base of crusher in permanent position
March 2012
Primary crusher Lomas II Installation of base of crusher in permanent position
March 2012
Primary crusher Lomas II
General view of foundation for installation of crusher
March 2012
Primary crusher Lomas II General view of foundation for installation of crusher
March 2012
Primary crusher
Panoramic view of new platform, installation of primary crusher Lomas II, contrction wall N° 1, 2,3,4 and foundation for crusher
March 2012
Primary crusher Panoramic view of new platform, installation of primary crusher Lomas II, contrction wall N° 1, 2,3,4 and foundation for crusher
January 2012
Overhead view of irrigation of ROM pad with acidulate plant
January 2012
Overhead view of irrigation of ROM pad with acidulate plant
January 2012
ROM pad
Distribution system for irrigating pad with raffinate
January 2012
ROM pad Distribution system for irrigating pad with raffinate
January 2012
ROM pad
PLS pond and emergency pond
January 2012
ROM pad PLS pond and emergency pond
January 2012
N°2 transfer pond, raffinate pumped to ROM pad
January 2012
N°2 transfer pond, raffinate pumped to ROM pad
January 2012
N°1 transfer pond, raffinate pumped into Nº2 transfer pond
January 2012
N°1 transfer pond, raffinate pumped into Nº2 transfer pond
January 2012
Primary crusher
Construction of base of foundations for assembly
January 2012
Primary crusher Construction of base of foundations for assembly
January 2012
Primary crusher
Construction of structural base
January 2012
Primary crusher Construction of structural base
January 2012
Primary crusher
Construction of structural base
January 2012
Primary crusher Construction of structural base
January 2012
Platform for unloading sulphuric acid for storage and subsequent use in acidulation of ROM pad.
January 2012
Platform for unloading sulphuric acid for storage and subsequent use in acidulation of ROM pad.
January 2012
Sulphuric acid storage tank
Under construction
January 2012
Sulphuric acid storage tank Under construction
January 2012
Primary crusher  assembly platform
Start of construction of wall N°4 and base of crusher foundations.
January 2012
Primary crusher assembly platform Start of construction of wall N°4 and base of crusher foundations.
January 2012
Truck unloading platform at crusher
Construction of support wall
January 2012
Truck unloading platform at crusher Construction of support wall
December 2011
PLS pond pumping station
December 2011
PLS pond pumping station
December 2011
Irrigation mains of ROM pad (irrigation with acidulate and irrigation with raffinate).
December 2011
Irrigation mains of ROM pad (irrigation with acidulate and irrigation with raffinate).
December 2011
Overland conveyor belts
Construction of assembly platform
December 2011
Overland conveyor belts Construction of assembly platform
November 2011
Unloading of PLS solution in pond with HPLS head
November 2011
Unloading of PLS solution in pond with HPLS head
November 2011
Sulphuric acid unloading station at night
November 2011
Sulphuric acid unloading station at night
November 2011
PLS pond pumping station
November 2011
PLS pond pumping station
November 2011
Irrigation mains of Fortuna ROM pad (irrigation with acidulate and irrigation with raffinate).
November 2011
Irrigation mains of Fortuna ROM pad (irrigation with acidulate and irrigation with raffinate).
November 2011
Fortuna ROM pad
Irrigation stage.
November 2011
Fortuna ROM pad Irrigation stage.
November 2011
Overland conveyor belts
Construction of assembly platform
November 2011
Overland conveyor belts Construction of assembly platform
October 2011
Collector trench
Installation of HDPE piping
October 2011
Collector trench Installation of HDPE piping
October 2011
Collector trench for raffinate and PLS solutions piping
Overview
October 2011
Collector trench for raffinate and PLS solutions piping Overview
October 2011
ROM acidulation station
October 2011
ROM acidulation station
October 2011
Fortuna ROM pad sector, showing the Fortuna Pit, the emergency PLS pond and the solutions piping collector trench. Aerial view
October 2011
Fortuna ROM pad sector, showing the Fortuna Pit, the emergency PLS pond and the solutions piping collector trench. Aerial view
October 2011
Fortuna electricity substation
Aerial view
October 2011
Fortuna electricity substation Aerial view
October 2011
Overland conveyor belts platform sector and Fortuna primary crusher
Aerial view
October 2011
Overland conveyor belts platform sector and Fortuna primary crusher Aerial view
October 2011
Fortuna Pit
Overview
October 2011
Fortuna Pit Overview
September 2011 
Acidulation station, Fortuna ROM pile
Under construction
September 2011
Acidulation station, Fortuna ROM pile Under construction
September 2011
PLS collector pond at Fortuna ROM pile 
Construction
September 2011
PLS collector pond at Fortuna ROM pile Construction
September 2011
Substation and electricity control room at Nº 1 raffinate transfer pond
Under construction
September 2011
Substation and electricity control room at Nº 1 raffinate transfer pond Under construction
September 2011
Overview of camp
September 2011
Overview of camp
September 2011
Emergency acid pond, acidulation station and Fortuna ROM pile
Under construction
September 2011
Emergency acid pond, acidulation station and Fortuna ROM pile Under construction
September 2011
Sulphuric acid storage tank, with acid unloading area, storage and emergency acid collector pond
Under construction
September 2011
Sulphuric acid storage tank, with acid unloading area, storage and emergency acid collector pond Under construction
September 2011
TK sulphuric acid unloading platform
Under construction
September 2011
TK sulphuric acid unloading platform Under construction
September 2011
Raffinate transfer pond
Construction of Nº 2
September 2011
Raffinate transfer pond Construction of Nº 2
September 2011
Nº 1 raffinate transfer pond (impermeability of pond bottom) Water mirror test
September 2011
Nº 1 raffinate transfer pond (impermeability of pond bottom) Water mirror test
September 2011
Raffinate pumps, Nº 1 transfer pond
Assembly
September 2011
Raffinate pumps, Nº 1 transfer pond Assembly
September 2011
Raffinate pumps, Nº 1 transfer pond 
Assembly
September 2011
Raffinate pumps, Nº 1 transfer pond Assembly
September 2011
Fortuna primary crusher area
Earth movement
September 2011
Fortuna primary crusher area Earth movement
September 2011
Fortuna Pit
Perforation and extraction of mineral area
September 2011
Fortuna Pit Perforation and extraction of mineral area
September 2011
Fortuna pit
Overview
September 2011
Fortuna pit Overview
August 2011
Primary crusher platform 
Earthworks
August 2011
Primary crusher platform Earthworks
August 2011
Fortuna mine aerial view
August 2011
Fortuna mine aerial view
August 2011
Pump system for refining solution pool
August 2011
Pump system for refining solution pool
August 2011
Construction of transfer pools, collecting pool and pump system
August 2011
Construction of transfer pools, collecting pool and pump system
August 2011
Extension of electrical sub station at Lomas Bayas.
August 2011
Extension of electrical sub station at Lomas Bayas.
August 2011
Construction of electrical sub station
August 2011
Construction of electrical sub station
August 2011
Aerial view of construction camp with nine blocks
August 2011
Aerial view of construction camp with nine blocks
August 2011
Discharge platform for sulphuric acid 
Under construction
August 2011
Discharge platform for sulphuric acid Under construction
August 2011
Storage tank for sulphuric acid 
Under construction
August 2011
Storage tank for sulphuric acid Under construction
August 2011
Pump station under construction
August 2011
Pump station under construction
August 2011
Construction of the PLS pool for ROM pile
August 2011
Construction of the PLS pool for ROM pile
August 2011
ROM Pile
Aerial view
August 2011
ROM Pile Aerial view
June 2011
Laying of steel piping for pumping of raffinate from Lomas Bayas to Lomas Bayas II
Construction
June 2011
Laying of steel piping for pumping of raffinate from Lomas Bayas to Lomas Bayas II Construction
June 2011
PLS and emergency PLS ponds  
Under construction
June 2011
PLS and emergency PLS ponds Under construction
June 2011
PLS containment pond 
Construction
June 2011
PLS containment pond Construction
June 2011
Emergency PLS pond
Construction
June 2011
Emergency PLS pond Construction
June 2011
Pool for collecting raffinate and PLS mains pipes
Construction
June 2011
Pool for collecting raffinate and PLS mains pipes Construction
June 2011
ROM pile 
Completing construction of first 900,000-m2 stage
June 2011
ROM pile Completing construction of first 900,000-m2 stage
June 2011
Sulphuric acid storage tank 
Construction
June 2011
Sulphuric acid storage tank Construction
June 2011
Acidulation station (sector where sulphuric acid is mixed with raffinate or water)
Under construction
June 2011
Acidulation station (sector where sulphuric acid is mixed with raffinate or water) Under construction
June 2011
Trench for collection of solutions 
Under construction
June 2011
Trench for collection of solutions Under construction
May 2011
Area of sulphuric acid tank 
Construction stage
May 2011
Area of sulphuric acid tank Construction stage
May 2011
Fortuna electricity substation 
Under construction
May 2011
Fortuna electricity substation Under construction
May 2011
Transfer pool one
Construction of pumping station
May 2011
Transfer pool one Construction of pumping station
May 2011
Transfer pool two 
Construction of civil works
May 2011
Transfer pool two Construction of civil works
May 2011
PLS and emergency ponds
Construction of civil works
May 2011
PLS and emergency ponds Construction of civil works
May 2011
ROM pile
Completion of 12 out of 15 cells
May 2011
ROM pile Completion of 12 out of 15 cells
May 2011
Area of sulphuric acid tank 
Construction stage
May 2011
Area of sulphuric acid tank Construction stage
May 2011
Acidulation station
Under construction
May 2011
Acidulation station Under construction
May 2011
PLS and raffinate trench
Construction of third segment
May 2011
PLS and raffinate trench Construction of third segment
May 2011
PLS and raffinate trench
Construction of second segment
May 2011
PLS and raffinate trench Construction of second segment
May 2011
PLS and raffinate trench
Construction of first segment
May 2011
PLS and raffinate trench Construction of first segment
May 2011
Barrio Cívico 
Completion of construction of pavilions one to four
May 2011
Barrio Cívico Completion of construction of pavilions one to four
May 2011
Barrio Cívico 
Completion of construction of pavilions one to four
May 2011
Barrio Cívico Completion of construction of pavilions one to four
March 2011
Construction of Nº 1 raffinate solution transfer pond.
March 2011
Construction of Nº 1 raffinate solution transfer pond.
March 2011
Sulphuric acid storage tank. 
Foundations for construction
March 2011
Sulphuric acid storage tank. Foundations for construction
March 2011
220kV transmission line. 
Installation of connection system
March 2011
220kV transmission line. Installation of connection system
March 2011
Pipes to carry PLS and raffinate solutions.  
Construction of trench.
March 2011
Pipes to carry PLS and raffinate solutions. Construction of trench.
March 2011
ROM pile.
View from the east of construction.
March 2011
ROM pile. View from the east of construction.
March 2011
ROM pile.
Overview of construction of the base.
March 2011
ROM pile. Overview of construction of the base.
January 2011
Platforms for storage of sulphuric acid.  
Earth movement.
January 2011
Platforms for storage of sulphuric acid. Earth movement.
January 2011
HDPE sheeting and drainage pipes (perforated tubes). 
Unloaded for spreading by bulldozer.
January 2011
HDPE sheeting and drainage pipes (perforated tubes). Unloaded for spreading by bulldozer.
January 2011
Trench for collection of solutions.
Preparation of ground.
January 2011
Trench for collection of solutions. Preparation of ground.
January 2011
ROM pile 
Earth movement and preparation for the installation of HDPE sheeting.
January 2011
ROM pile Earth movement and preparation for the installation of HDPE sheeting.
January 2011
Overview of the ROM pile.
Construction of the first 900,000 m2 stage.
January 2011
Overview of the ROM pile. Construction of the first 900,000 m2 stage.
January 2011
Barrio Cívico. 
Installation of drinking water mains, fire-control system and sewage system.
January 2011
Barrio Cívico. Installation of drinking water mains, fire-control system and sewage system.
January 2011
Pipes to carry PLS and raffinate solutions. 
Construction layout.
January 2011
Pipes to carry PLS and raffinate solutions. Construction layout.
28 December 2010
ROM Pile
Construction of the first four pads
28 December 2010
ROM Pile Construction of the first four pads
28 December 2010
Fresh water pumping station and electricty control room
Operational
28 December 2010
Fresh water pumping station and electricty control room Operational
29 November 2010 
Construction camp with 316 rooms
Completed
29 November 2010
Construction camp with 316 rooms Completed
29 November 2010.
HDPE pipeline to carry water to Lomas Bayas II
29 November 2010.
HDPE pipeline to carry water to Lomas Bayas II
29 November 2010
Carbon steel tank to store 544 m3 water
Completed
29 November 2010
Carbon steel tank to store 544 m3 water Completed
20 November 2010 
ROM pile overview
Cuttings and refill of land underway
20 November 2010
ROM pile overview Cuttings and refill of land underway
29 November 2010. 
Water pipeline ascent path
29 November 2010.
Water pipeline ascent path
29 November 2010
ROM pile
Cuttings and refill of land underway
29 November 2010
ROM pile Cuttings and refill of land underway