November 2012 First truck load of Antapaccay concentrate arriving at Matarani Port | November 2012 Loading concentrate at Antapaccay | November 2012 Copper in concentrate production at Antapaccay |
October 2012 Conveyor belt | October 2012 Concentrator plant | October 2012 Ore stockpile |
October 2012 Pebbles stockpile | October 2012 Tailings thickeners | October 2012 Side view of grinding and flotation building |
October 2012 Regrinding area | October 2012 Concentrate storage building | October 2012 Side view of floating cells |
October 2012 Concentrate stockpile | October 2012 Concentrate thickener | October 2012 Concentrate filtering building |
October 2012 Concentrate filtering building | October 2012 Concentrate storage building | October 2012 Concentrate storage building |
October 2012 Closing works on the concentrate storage building | October 2012 Concentrate storage building | October 2012 Lime storage tank and lime discharge belt |
October 2012 Lime storage tank | October 2012 Concentrate storage building | October 2012 Concentrate emergency storage pool |
October 2012 Concentrate filtering building | October 2012 Concentrate storage building | October 2012 Partial view of harmonic filter yard and lime storage tank |
October 2012 Panoramic view of Conveyor Belt | September 2012 220 kV Sub station and harmonic filter yard | September 2012 Concentrate storage building |
September 2012 Pebble crusher area & pebble stockpile | September 2012 Panoramic view from stacker | September 2012 Tailing thickeners area works |
September 2012 Side view of grinding area | September 2012 Stockpile reclaim tunnels. Ore & ball conveyors steel structure installation | September 2012 Filter plant |
September 2012 Isa Mill installation | September 2012 Isa Mill installation | |
September 2012 Panoramic view of grinding and flotation area | September 2012 Flocculants building | September 2012 General view of overland conveyor |
September 2012 Overland conveyor at night | August 2012 Panoramic view of the truck shop | August 2012 220kV Sub staion and harmonic filter yard |
August 2012 First turn SAG mill | August 2012 Overland conveyor | August 2012 Part of the truck shop |
August 2012 Inside the truck shop | August 2012 View of truck shop | August 2012 Isa mills installation |
August 2012 View of concentrate thickener | August 2012 Flocculants building | August 2012 Stockpile reclaim tunnels. Ore and ball conveyors steel structure installation |
August 2012 Side view of grinding area (in the back) | August 2012 View of grinding area | August 2012 View of flotation area |
August 2012 First fuel charge to mining truck | August 2012 First fuel charge to mining truck | August 2012 Pebble crusher area and pebble stockpile |
August 2012 View of grinding area | August 2012 Overland conveyor | August 2012 General view of overland conveyor |
August 2012 Primary crusher building and sacrificial conveyor | August 2012 Panoramic view of the flotation and grinding areas | August 2012 Tailings thickener area works |
August 2012 Truck delivers ore to primary crusher | August 2012 View of concentrator. On the far left, the stacker provides crushed ore to a stockpile to feed the concentrator for grinding and flotation. On the far right, the fixed plant yellow tower crane is used to conduct maintenance on the flotation cell lines. | July 2012 Primary crusher completed |
July 2012 Stacker assembly sequence 05 | July 2012 Stacker assembly sequence 04 | July 2012 Stacker assembly sequence 03 |
June 2012 Stacker assembly sequence 02 | June 2012 Stacker assembly sequence 01 | June 2012 Truck Shop
Panoramic view |
June 2012 Stockpile
Reclaim tunnels. Ore & ball conveyors steel structure installation | June 2012 Grinding Area
Side view | June 2012 Pebbles Area
Pebble crusher |
June 2012 Overland Conveyor
| June 2012 Stacker
Installation | June 2012 Tailings Thickeners
Area works |
June 2012 Tailings Thickeners
View of the underflow thickener tunnels | June 2012 Regrinding Area
Isa mills installation | June 2012 Primary Crusher
Control room final stage |
June 2012 Filter Plant
Concentrate storage building | | June 2012 Truck Shop
Side view |
June 2012 Grinding Area
View of cyclons and control room construction | June 2012 Grinding and Flotation Area
Panoramic view | june 2012 Primary Crusher
Building and sacrificial conveyor final stage |
| May 2012 Truck Shop Area
General view | May 2012 220 Kv Substation
Electrical room and filter yard construction |
May 2012 Pebbles Area
Pebble crusher installation | May 2012 Tailings Thickeners
View of the entrance of the underflow thickener pumping | May 2012 Grinding Area
General view - Steel structure installation |
May 2012 Tailings Thickeners
Foundation and water tank constrution | May 2012 Tailings Thickeners
Earthworks | May 2012 Tailings Thickeners
Interior works pump station |
May 2012 Regrinding
Isa mill installation | May 2012 Regrinding
Isa mill installation | May 2012 Truck Shop Area
Steel structure installation |
May 2012 Stacker
Foundation | May 2012 Truck Shop Area
Front View | May 2012 Primary Crusher
Control room final stage |
May 2012 Ball Mill No. 2
Liners installation | May 2012 Ball Mill No 2
Liners installation | May 2012 Stockpile
Reclaim tunnel and ball storage bin
Conveyor steel structure installation |
May 2012 Fuel Station
Panoramic view from primary crusher | May 2012 Filter Plant
Tanks | May 2012 Filter Plant
Concentrate storage building |
May 2012 Primary Crusher
Building final stage | May 2012 Grinding and Flotation Area
Panoramic view | April 2012 Truck Shop -
General view |
April 2012 Tailings Thickener -
Foundation and water tank construction | April 2012 Stockpile -
Reclaim tunnel and ball storage bin | April 2012 220 Kv Substation -
Electrical room and harmonic filter yard construction |
April 2012 Truck Shop -
Front view | April 2012 Overland Conveyor -
General view | April 2012 Pebble Crusher -
Installation |
April 2012 Filter Plant -
Concentrate storage building | April 2012 Filter Plant
Tanks | April 2012 Primary Crusher
Control room final stage |
April 2012 Grinding Area
General view of grinding area - Steel structure installation | April 2012 Primary Crusher
Building final stage | April 2012 Grinding and Flotation Area
Panoramic view |
March 2012 Truck shop
Earthworks and steel structure installation | March 2012 Filter plant
Tank | March 2012 220 Kv substation
Electrical room and harmonic filter yard construction |
March 2012 Filter plant
Concentrate storage building | March 2012 Process ponds
Piping installation | March 2012 Pebble crusher
Installation |
March 2012 Grinding area
General view - steel structure installation | March 2012 Truck shop
Front view | March 2012 Stacker
Foundation |
March 2012 Overland conveyor
Panoramic view from primary crusher | March 2012 Primary crusher
Building final stage | March 2012 Grinding and flotation área
Panoramic view |
March 2012 Stockpile
Reclaim tunnel and ball storage bin | March 2012 First blast
Commencement of mining activities which include pre-stripping and ore stockpiling in preparation for the mechanical completion and start-up of the concentrator plant and other facilities. | March 2012 Tailing thickeners
Foundation and water tank construction |
February 2012 Grinding building
Partial view of one side | February 2012 Grinding building
Partial view of side | February 201 Truck shop
Earthworks and steel structure installation |
February 2012 Truckshop
Earthworks and steel structure installation | February 2012 Stockpile
Reclaim tunnel and ball storage bin | |
February 2012 220 Kv substation
Electrical room and harmonic filter yard construction | February 2012 Overland conveyor
Panoramic view | February 2012 Truck shop
Gates |
February 2012 Grinding area
General view - steel structure installation | February 2012 Process ponds
Earthworks | February 2012 Filter plant
Concentrate storage tanks |
February Pebbles area
Pebble crusher installation | February 2012 Overland conveyor
General view | February 2012 Tailings thickener
Foundation and water tank construction |
February 2012 Grinding area
Steel structure installation | February 2012 Overland conveyor
View of end part | |
February 2012 Grinding building
Partial view of side | February 2012 Primary crusher | February 2012 Primary crusher
Building final stage |
February 2012 Grinding and flotation area
Panoramic view | January 2012 Pebbles area
Pebbles crusher installation | January 2012 Truck shop
Earthworks and steel structure installation
|
January 2012 Overland conveyor
Panoramic view from primary crusher | January 2012 220 Kv Substation
Electrical room and harmonic filter yard construction
| January 2012 Overland conveyor
General view |
January 2012 Primary Crusher
Building final stage | January 2012 Grinding and flotation area
Panoramic view | December 2011 Truck Shop
Earthworks and Steel Structure installation |
December 2011 Stockpile
Reclaim Tunnel and Ball Storage Bin
| December 2011 Tailings Thickeners
Foundation and Water Tank Construction
| December 2011 Regrinding area
Retaining Wall and Electrical Room Foundations
|
December 2011 Grinding Area
General view – steel structure installation
| December 2011 Pebbles Area
Pebble crusher installation
| December 2011 220 Kv Substation
Electrical Room and Fire Wall Construction
|
December 2011 Filter Plant
Concentrate Storage Tanks | December 2011 Process Ponds
Earthworks | December 2011 Overland Conveyor
Panoramic View from Primary Crusher
|
December 2011 Primary Crusher
TEM wall construction | December 2011 Truck Shop
Earthworks and Steel Structure installation | December 2011 Grinding and Flotation Area
Panoramic View |
December 2011 Primary Crusher
Building Final Stage | November 2011 Primary Crusher
Middle Shell mounting sequence at primary crusher
| November 2011 Primary Crusher
Middle Shell mounting sequence at primary crusher
|
November 2011 Primary Crusher
Middle Shell mounting sequence at primary crusher | November 2011 Primary Crusher
Middle Shell mounting sequence at primary crusher
| November 2011 Grinding area
Steel structure installation |
November 2011 Truck Shop
Earthworks and Steel Structure installation | November 2011 Stockpile
Reclaim Tunnel and Ball Storage Bin
| November 2011 Tailings Thickeners
Foundation and Water Tank Construction
|
November 2011 Regrinding
Retaining Wall and Electrical Room Foundations | November 2011 Pebbles Area
Pebble crusher installation | November 2011 220 Kv Substation
Electrical Room and Fire Wall Construction
|
November 2011 Primary Crusher
TEM wall construction | November 2011 Filter Plant
Concentrate Storage Tanks | November 2011 Process Ponds
Earthworks at process ponds area |
November 2011 Truck Shop
Earthworks and Steel Structure installation | November 2011 Overland Conveyor
Panoramic View from Primary Crusher
| November 2011 Grinding and Flotation Area
Panoramic View |
November 2011 Primary Crusher
Building Final Stage | October 2011 Truck Shop
Earthworks and steel structure installation | October 2011 Stockpile
Stockpile reclaim tunnel and ball storage bin
|
October 2011 Grinding area
Steel structure installation | October 2011 Regrinding area
Retaining Wall and Electrical Room Foundations
| October 2011 Tailings Thickeners
Foundation and Water Tank Construction |
October 2011 Overland Conveyor
Panoramic View from Primary Crusher | October 2011 Primary Crusher
TEM wall construction | October 2011 Truck Shop
Earthworks and Steel Structure installation |
October 2011 Process Ponds
Earthworks | October 2011 Concentrator Building
SAG Mill Stator Assembly | October 2011 220 Kv Substation
Electrical Room and Fire Wall Construction
|
October 2011 Primary Crusher
Building fifth stage | October 2011 Grinding and Flotation area
Pnoramic view | September 2011 Grinding Area
Steel Structure installation |
September 2011 Regrinding
Retaining Wall and Electrical Room Foundations
| September 2011 Concentrator Building
Ball Mill 2 Stator Assembly Preparation
| September 2011 Pebbles Area
Pebble crusher installation
|
September 2011 Flotation area | September 2011 Overland Conveyor
Panoramic View | September 2011 Primary Crusher
Building Fifth Stage |
September 2011 Truck Shop
Earthworks and Steel Structure installation | September 2011 Truck Shop
Earthworks and Steel Structure installation | September 2011 Tailings Thickeners
Foundation and Water Tank Construction
|
September 2011 Filter Plant
Concentrate Storage Tanks
| September 2011 220 Kv Substation
Electrical Room and Fire Wall Construction
| September 2011 Process ponds
Earthworks |
September 2011 Plant
Panoramic view | August 2011 Process ponds
Earthworks | August 2011 Tailings thickeners
Earthworks |
August 2011 SAG Mill
Overview | August 2011 Grinding area
Steel structure assembly | August 2011 SAG mill
Trunnion installation |
August 2011 Grinding area
Steel structure assembly | August 2011 Pebbles area
Overview | August 2011 Overland conveyor
Earthworks |
August 2011 Primary crusher
Wall construction | August 2011 Primary crusher
Top floor construction | August 2011 Truck shop
Steel structure installation |
August 2011 Primary crusher
Wall construction | August 2011 Truck shop
Steel Structure installation | August 2011 Regrinding area wall
Concrete pouring stage |
August 2011 Flotation area | August 2011 220 kV substation
Installation | August 2011 Overland conveyor
Earthworks |
August 2011 Tailings thickeners
Earthworks | August 2011 Pebbles area overview
Stockpile and trituration | August 2011 Balls mill
Shells assembly |
August 2011 Flotation and grinding area
Overview | August 2011 Truck shop
Installation of metallic structure | July 2011 Stock Pile
Rebar preparation |
July 2011 Grinding Area
Steel structure installation | July 2011 Tailings Thickeners
Earthworks | July 2011 Regrinding area
Concrete pouring stage |
July 2011 Pebbles Area
Rebar installation stage | July 2011 Pebbles area
Rebar installation stage | July 2011 Grinding Area
Installation of SAG mill covers |
July 2011 Truck Shop
Steel Structure erection | July 2011 Overland Conveyor
Earthworks | July 2011 Primary Crusher
TEM wall construction |
July 2011 Truck Shop
Steel Structure erection | July 2011 Primary Crusher
TEM wall construction | July 2011 Primary Crusher
TEM wall construction |
July 2011 Flotation area
Flotation cells installation | July 2011 Flotation
Flotation cells installation | July 2011 Balls Mills
General view of Lifting Shells |
July 2011 Process Ponds
Earthworks | July 2011 Grinding Area
Installation of SAG mill covers.
| July 2011 Primary Crusher
Panoramic View |
July 2011 Flotation area
Installation of the flotation cells | July 2011 Balls Mills
General view of Lifting Shells | |
July 2011 SAG Mill
Shell installation | June 2011 Tailings Thickeners
Earthworks | June 2011 Primary crusher
Rebar installation |
June 2011 Construction camp
Overview | June 2011 Truck Shop
Earthwoks | June 2011 Truck shop
Earthworks |
June 2011 Overland Conveyor
Earthwork | June 2011 Grinding and flotation area
Overview | June 2011 Pebbles Area
Rebar installation stage |
June 2011 Overland conveyor
Earthwork | June 2011 Stock pile reclaim tunnel
Rebar preparation | June 2011 Stock pile reclaim tunnel
Rebar preparation |
June 2011 Regrinding area
Concrete pouring stage | June 2011 SAG Mill
Shell assembly | June 2011 Grinding area
Steel structure installation |
June 2011 Primary crusher
TEM wall construction | June 2011 SAG Mill
First shell erection | June 2011 SAG MIll
First shell erection |
June 2011 SAG Mill
First shell erection | May 2011 Stock pile
Rebar preparation at reclaim tunnel | May 2011 Pebbles area
Overview |
May 2011 SAG mill mounting
Fist stage - sole plates | May 2011 Stock pile
Rebar preparation at reclaim tunnel | May 2011 Overland conveyor
Earthwork |
May 2011 Construction camp
Overview | May 2011 Truckshop
Building foundations preparation | May 2011 Truckshop
Building foundations preparation |
May 2011 Overland conveyor
Bridge foundation preparation | May 2011 Primary crusher building walls
Rebar installation | May 2011 Concentrator building
Pedestals |
May 2011 Tailing thickeners area
Earthworks | | May 2011 Grinding area
Rebar preparation at Ball Mills |
May 2011 Flotation cells
Platforms | April 2011 Grinding and flotation area
Overview | April 2011 Flotation area
Rebar placement
|
April 2011 Grinding area SAG mill
Preparation for last concrete pouring stage
| April 2011 Stock pile reclaim tunnel
Rebar preparation
| April 2011 Concentrator building
Rebar installation at foundation
|
April 2011 Grinding area
Rebar preparation at Ball Mill 1 & 2
| April 2011 Construction camp
Overview | April 2011 Overland conveyor
Earthworks
|
April 2011 Primary crusher
First elevated slab completed
| April 2011 Truck shop area
Earthworks
| April 2011 Truck shop area
Earthworks
|
April 2011 Primary crusher building walls
Rebar installation
| April 2011 Tailings thickeners area
Earthworks
| April 2011 Construction camp
Minimarket
|
March 2011 Concentrator building
Rebar installation at foundation
| March 2011 Tailings thickeners area
Earthworks
| March 2011 Grinding area
Rebar preparation at Ball Mill 1 & 2
|
March 2011 Overland conveyor
Earthworks
| March 2011 Stock pile reclaim tunnel
Rebar preparation
| March 2011 Construction camp
Overview |
March 2011 Truck shop area
Earthworks
| March 2011 Truck shop area
Earthworks
| March 2011 Overland Conveyor
Earthworks |
March 2011 Primary Crusher building
First elevated slab completed
| March 2011 Primary Crusher building walls
Rebar installation
| March 2011 Flotation area
Rebar placement |
March 2011 Grinding area - SAG mill
Preparation for last concrete pouring stage | February 2011 Primary crusher
Rebar installation
| February 2011 Primary crusher
Rebar installation
|
February 2011 Overland conveyor
Earthworks completed
| February 2011 Grinding area – SAG mill
Fifth concrete pouring stage
| February 2011 Grinding area – Ball mill 1 & 2
Rebar installation
|
February 2011 Tailing thickeners
Earthworks
| February 2011 Stock pile
Rebar installation at stock pile reclaim tunnel
| February 2011 220 kV substation
Earthworks |
February 2011 Construction camp
Panoramic view
| February 2011 Truck shop
Earthworks
| 27 January 2011 Grinding area
Assembly of crane |
6 January 2011 Grinding area
Completion of foundations | January 2011 Overland conveyor
Earthworks
| January 2011 SAG mill
Third concrete pouring stage |
January 2011 Panoramic view of the construction camp
Completed | January 2011 General view construction Offices
Completed | January 2011 Primary Crusher
Foundation after first concrete pouring
|
January 2011 Grinding area
General view after second concrete pouring
| January 2011 Stock pile
Earthworks
| January 2011 220 kV Substation
Earthworks
|
17 December 2010 220kV electrical sub station
Mass excavation underway | 17 December 2010 Flotation area
Earthworks underway | 17 December 2010 Tailings thickeners
Earthworks underway |
17 Deciember 2010 Grinding area - ball mill
Arrival of shells | 17 December 2010 Second ball mill
Concrete curing | 28 November 2010 Grinding area - SAG mill
Preparation of third stage concreting |
17 December 2010 Overland conveyor
Earthworks underway | 17 December 2010 Primary crusher
Installation of foundation structure | 17 December 2010 Overview of construction camp
Complete |
8 December 2010 Second ball mill
Concrete pour | 7 December 2010 Pebble crusher
Mass earthworks underway
| 1 December 2010 Filter Plant & Concentrate Storage Area
Earthworks completed |
1 December 2010 Pebble crusher
Mass earthworks underway | 1 December 2010 220kV electrical sub station
Mass excavation underway | 1 December 2010 Tailings thickeners (done by the owner’s team)
Underway |
1 December 2010 Concrete plants
Two fully operative | 1 December 2010 Construction camp
Complete | 1 December 2010 Construction camp
Complete. 460 people already living in |
1 December 2010 Primary crusher
Earthworks completed and lean concrete poured underway | 1 December 2010 Overland Conveyor
Earthworks underway | 28 November 2010 Grinding area - SAG mill
Concrete underway and foundations being poured |
26 November 2010 Camp staff
First lunch |